  • As the Bourn Facility has now been established as a design / development / manufacturing facility to its sister company Aero Vodochody, It was vital to undertake the requirement to achieve EASA 21 Part G approval. This is underway, an assessor visit is planned April 2009.
  • Together with the above, BS EN 9100 Design / Development / Production accreditation is also being evaluated. Its planned to achieve approval by end of June 2009.
  • The necessity for this capability is project driven and is a real requirement.
  • Current Capability: AutoCad version 2004 and Auto desk Inventor. With Catia V5 (revision 19) ZAC licence (Composite configuration).

Resources

  • Two design engineers
  • One dedicated Metallic design & stress engineer.
  • Two specific Composite design engineers
  • One dedicated stress engineer.